Tru Concrete pours new concrete driveways for new builds and existing homes in Exeter, Visalia, Tulare and nearby towns. The photos below are Tim McCormick’s own jobs, poured up to the garage with saw-cut joints and smooth borders. Tim holds C-8 license #1008445. Call or text (559) 793-6062 for a free estimate.

New broom-finish concrete driveway with saw-cut joints in front of a two-car garage
Tru Concrete job photo

What this covers

  • New driveways at new homes
  • Driveways where there was gravel or dirt
  • Saw-cut or tooled joints
  • Broom finish with smooth borders

Joints are planned cracks

Concrete shrinks as it dries, and NRMCA says it is not possible to make completely crack-free concrete. Joints decide where the cracks go. NRMCA calls them “simply pre-planned cracks.”

Its guidance for slabs on the ground: space joints no more than 24 to 36 times the slab thickness, which works out to about 10 feet for a 4-inch slab, and no more than 15 feet in any case. Keep panels square or close to it, never more than 1.5 times as long as they are wide, and avoid L-shaped panels.

Timing the saw cut

Saw-cut joints have a window. NRMCA says conventional saw cuts should be made within 4 to 12 hours after finishing, and cut at least a quarter of the slab’s thickness deep. Cut too early and the edges ravel. Cut too late and the slab may crack on its own first.

Many of the driveways in our photos show this layout: straight saw cuts with smooth trowel bands framing broom-finish panels.

Recent new driveways work

Long concrete driveway with smooth trowel bands framing broom-finish panels
New concrete driveway poured up to a garage door
Wet concrete driveway with border bands curing in front of a house
Freshly poured concrete driveway leading to a white garage door
Concrete pad poured under a carport with a work truck beyond it
Concrete driveway approach and retaining wall cap at a two-story house

See every project photo

Where Tim pours new driveways

Questions people ask

Do you pour driveways at new homes?

Yes. New driveways are on Tim’s service list, and many of the photos on this page are new construction.

How far apart should driveway joints be?

NRMCA recommends a maximum joint spacing of 24 to 36 times the slab thickness, about 10 feet for a 4-inch slab, and no more than 15 feet.

Will a new driveway crack?

NRMCA says it is not possible to produce completely crack-free concrete, but joints, good subgrade, the right mix and proper curing control where and how much it cracks.